Glencore Chief Executive Officer, Gary Nagle:

“The asset base has largely performed in line with our expectations and our full year production guidance remains unchanged. Notably, as energy markets have improved, we are recovering from the market-driven production cuts initiated within our Australian coal portfolio in H2 2020.

“Basis Marketing’s continued strong performance, we now expect full year 2021 Adjusted EBIT to exceed the top end of our $2.2-3.2 billion per annum long-term guidance range.”

Production from own sources – Total1
YTD 2021 YTD 2020 Change %
Copper kt 895.5 934.7 (4)
Cobalt kt 23.4 21.6 8
Zinc kt 855.8 860.1 –
Lead kt 173.4 194.3 (11)
Nickel kt 71.1 81.8 (13)
Gold koz 593 655 (9)
Silver koz 23,794 23,220 2
Ferrochrome kt 1,071 651 65
Coal - coking mt 6.6 5.6 18
Coal - semi-soft

mt 3.5 3.6 (3)
Coal - thermal mt 66.2 74.3 (11)
Coal

mt 76.3 83.5 (9)
Oil (entitlement interest basis) kboe 4,145 3,360 23
1 Controlled industrial assets and joint ventures only. Production is on a 100% basis, except as stated.

Production guidance
No change to previous 2021 production guidance.
Actual
FY 2018 Actual FY 2019 Actual FY2020 Previous guidance 2021 Guidance FY 2021
Copper kt 1,454 1,371 1,258 1,220 ± 30 1,220 ± 30
Cobalt kt 42.2 46.3 27.4 35 ± 3 35 ± 3
Zinc kt 1,068 1,078 1,170 1,170 ± 30 1,170 ± 301
Nickel kt 124 121 110 105 ± 5 105 ± 5
Ferrochrome kt 1,580 1,438 1,029 1,430 ± 30 1,430 ± 30
Coal mt 129 140 106 104 ± 4 104 ± 4
1 Excludes Volcan.

Production highlights
Own sourced copper production of 895,500 tonnes was 39,200 tonnes (4%) below the comparable 2020 period, reflecting lower mined grades at various operations. Approximately half this variance relates to lower copper by-product at non-Copper department assets.
Own sourced zinc production of 855,800 tonnes was in line with the comparable 2020 period. Recovery from 2020 Covid restrictions was offset by temporarily lower Kazzinc production pending the ramp-up of the recently commissioned Zhairem mine.
Own sourced nickel production of 71,100 tonnes was 10,700 tonnes (13%) lower than the comparable 2020 period due to planned maintenance at Murrin Murrin and various operating issues at Koniambo.
Attributable ferrochrome production of 1,071,000 tonnes was 420,000 tonnes (65%) higher than the comparable 2020 period, reflecting that operations were suspended for much of Q2 2020 due to the South African national lockdown, with a period of ramp-up thereafter.
Coal production of 76.3 million tonnes was 7.2 million tonnes (9%) lower than the comparable 2020 period, reflecting a full period of Prodeco care and maintenance, the progressive recovery from the market-related reductions across the Australian portfolio initiated in H2 2020 and lower domestic production/demand in South Africa.
Entitlement interest oil production of 4.1 million barrels of oil equivalent (boe) was 0.8 million boe (23%) higher than the comparable 2020 period. This mainly reflects the gas phase of a project in Equatorial Guinea that commenced in February 2021, and a full period contribution from the new Cameroon well. The Chad fields remained on care and maintenance throughout 2021.
Other matters
On 15 October 2021, Glencore reached an agreement to sell 100% of the interests in its wholly owned subsidiary Chemoil Terminals LLC, which owns the Long Beach and Carson oil products storage terminals in California. The sale consideration is $242 million and closing is subject to certain conditions precedent, including relevant anti-trust approval. We expect the transaction to close before the end of this year.
As previously announced, Glencore has reached agreement to dispose of its Bolivian zinc assets, Sinchi Wayra and Illapa, to Santa-cruz Silver Mining, Ltd, for consideration of approximately $110 million. The consideration is structured as a $20 million initial payment and a further $90 million to be paid within 4 years or less. Completion is expected to occur within the next three months.
As previously announced, Glencore was formally notified that the Colombian National Mining Agency has accepted the relinquishment of Prodeco’s key mining contracts back to the Republic of Colombia. The mines will remain on care and maintenance until the formal process of relinquishing the contracts is complete.
To view the full report please click: https://www.glencore.com/dam/jcr:9900b36f-78ae-49f1-aa62-69abaf137e4f/GLEN_2021-Q3_ProductionReport.pdf

For further information please contact:
Investors
Martin Fewings



Beperkte weergave !
Leden hebben toegang tot meer informatie! Omdat u nog geen lid bent of niet staat ingelogd, ziet u nu een beperktere pagina. Wordt daarom GRATIS Lid of login met uw wachtwoord


Copyrights © 2000 by XEA.nl all rights reserved
Niets mag zonder toestemming van de redactie worden gekopieerd, linken naar deze pagina is wel toegestaan.


Copyrights © DEBELEGGERSADVISEUR.NL