VANCOUVER, BC / ACCESSWIRE / February 22, 2024 / Pampa Metals Corp. ("Pampa Metals" or the "Company") (CSE:PM)(FSE:FIR)(OTCQB:PMMCF) is pleased to report that diamond drillhole PIU-01 (refer figure 1) was completed at a downhole depth of 867m. First assay results are expected shortly. Drillhole PIU 02, the second hole of the current program, has commenced.
Hole PIU-01, designed to extend Cu-Au mineralization to depth on the southwestern margin of the Piuquenes Central porphyry, intersected a 160m zone of supergene copper enrichment between 220m and 380m downhole, coincident, and overlapping with primary mineralization from 350 meters. Strong primary mineralization associated with intense porphyry A type quartz stockwork veining is evident from 350m to approximately 650m. From 650m to the end of hole at 867m quartz veining and mineralization continues, becoming progressively less intense with depth. From 830m disseminated hematite/specularite-pyrite-chalcopyrite mineralization is hosted in volcanic host rocks outside the porphyry intrusive and remains open at depth. see & read more on
https://www.accesswire.com/viewarticle.aspx?id=835691&lang=en |