Torex Gold Reports 2019 Year-End Mineral Reserves & Resources for El Limón Guajes Complex

Alleen voor leden beschikbaar, wordt daarom gratis lid!

Algemeen advies 28/04/2020 14:41
TORONTO, Ontario, April 28, 2020 – Torex Gold Resources Inc. (the “Company” or “Torex”) (TSX: TXG) reports that in 2019, for the Company’s El Limón Guajes (ELG) Complex, total gold reserves declined 9% (approximately 0.22 million ounces). Open pit gold reserves declined 19% year-over-year, primarily due to depletion. Exploration success resulted in underground gold reserves increasing 140%, net of depletion. The gold price used to estimate the 2019 year-end gold reserves is unchanged at US$1,200 per ounce. The Company also announces that it is continuing to rely on an exemption provided under Ontario securities law and plans to file the annual information form (the “AIF”) on or around May 6, 2020.

Fred Stanford, President & CEO of Torex, stated:

“By the beginning of 2024, the open pit portion of ELG will be mined out and Torex expects to be mining exclusively from underground resources, primarily from Media Luna. Between now and 2024, we have lots of time to continue the process of upgrading underground resources to reserves. In 2019 we completed the first infill drill program at Media Luna and upgraded 2.24 million gold equivalent ounces to the Indicated resource category. These ounces will be considered for conversion to reserves in a feasibility study, which is underway and is expected to be complete in H1 2021. Media Luna also contains a large Inferred resource of 4.56 million gold equivalent ounces. Some of these ounces will be targeted for upgrade to the Indicated resource category in a 2020 infill drill program. The timing of the infill drill program is such that the resulting upgraded ounces are also expected to be considered for conversion to reserves in the 2021 feasibility study. The Media Luna magnetic anomaly that hosts these Indicated and Inferred gold equivalent ounces is only 1/3rd explored and offers significant opportunity for future exploration to extend the Media Luna mine life.

“The ELG deposits also show significant down dip potential, some of which is currently being mined at Sub-Sill. The 2019 ELG underground exploration program resulted in a 140% increase in reserves, net of depletion. In 2020, the exploration program will continue under the El Limon pit at both Sub-Sill and ELD, and even broaden out to determine whether mineralization continues below the Guajes pit. We are preparing for the transition to underground mining, well in advance, and look forward to capitalizing on the potential of these underground resources and of our proprietary Muckahi Mining System.”

Table 1: Year-over-year comparison of mineral reserves & resources for the El Limón Guajes Complex

December 31, 2019 December 31, 2018 Variance
Tonnes(Mt) Au(g/t) Au(Moz) Tonnes(Mt) Au(g/t) Au(Moz) Tonnes(Mt) Au(g/t) Au(Moz)
Proven & Probable Reserves
Open Pit (including stockpiles) 21.40 2.76 1.90 24.82 2.92 2.33 (14%) (6%) (19%)
Underground 1.72 6.51 0.36 0.66 6.94 0.15 161% (6%) 140%
Total 23.12 3.04 2.26 25.48 3.02 2.48 (9%) 0% (9%)
Measured & Indicated Resources
Open Pit 24.85 2.97 2.37 35.78 2.77 3.19 (31%) 7% (26%)
Underground 2.87 7.07 0.65 1.17 7.04 0.26 146% 0% 151%
Total 27.73 3.39 3.03 36.95 2.91 3.45 (25%) 17% (12%)
Inferred Resources
Open Pit 2.42 1.88 0.15 3.52 1.89 0.21 (31%) (1%) (30%)
Underground 2.44 5.69 0.45 1.28 5.91 0.24 91% (4%) 86%
Total 4.86 3.79 0.59 4.80 2.96 0.45 1% 28% 32%

Notes:
1.The reader is cautioned not to misconstrue this tabulation as a mineral resource statement. Listed grades and tonnes are shown for comparison purposes only.
2.2019 mineral resources estimate excludes the impact of mineral resources related to the ELD underground, for which a maiden mineral resource and reserve was published in June 2019. Impact on open pit Measured & Indicated mineral resources at year-end 2019 was 3.0 Mt of ore and 0.31 Moz of gold that was depleted due to mining. Impact on open pit Inferred mineral resources at year-end 2019 was 0.8 Mt of ore and 0.08 Moz of gold that was depleted due to mining.
3.For additional information on mineral reserves and resources, please refer to the notes following Table 2 and 3 at the end of this press release.
4.Year-end mineral reserves and resources as well as year-over-year variance subject to rounding.

Mineral resources are classified in accordance with the 2014 CIM Definition Standards for Mineral Resources and Mineral Reserves and the 2019 CIM Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines (collectively, the “CIM Standards”).

ELG Mineral Reserves
Proven and Probable gold reserves declined 0.22 million ounces year-over-year assuming a gold price of US$1,200 per ounce, in line with the gold price used by the Company to estimate gold mineral reserves at the end of 2018 and in the Technical Report, as defined below (Table 2). The primary driver of the decline was mine depletion of 0.56 million ounces, including 0.51 million ounces processed with the remainder stockpiled. Success within the step-out and infill exploration programs at the Sub-Sill and ELD underground deposits helped offset depletion, with underground reserves (contained gold) increasing 0.21 million ounces, net of depletion of 0.10 million ounces. Beyond model adjustments, the key change to reserves reflects the use of a lower cut-off grade within the El Limón and Guajes open pits relative to the cut-off grade used at the end of 2018 (1.0 g/t gold versus 1.1 g/t).

ELG Mineral Resources
Measured and Indicated gold resources decreased 0.42 million ounces relative to the end of 2018, with ongoing exploration success within the underground deposits partially offsetting depletion (Table 3). Inferred gold resources increased 0.14 million ounces year-over-year primarily reflecting underground exploration success.

The gold price used to estimate open pit and underground mineral resources was US$1,550 per ounce, an increase over the US$1,380 per ounce gold price used to estimate resources at the end of 2018 and in the Technical Report. The application of a higher gold price to estimate resources at ELG is consistent with the gold price used to estimate resources at the Company’s Media Luna project. Open pit resources are estimated using a cut-off grade of 0.8 g/t gold versus the prior cut-off grade of 0.7 g/t, reflecting assumption of higher operating costs within the model.

Resources for the El Limón open pit have been adjusted to remove resources associated with the ELD underground deposit. Given a maiden resource for ELD was released during 2019, the same adjustment was not included in the 2018 year-end resource categories for the El Limón open pit (see notes for Table 1).

QA/QC and Qualified Persons
Torex maintains an industry-standard analytical quality assurance/quality control (QA/QC) and data verification program to monitor laboratory performance and to ensure high quality assay results. Results from this program confirm reliability of the assay results. All sampling is conducted by Torex Gold with analytical work for exploration programs at El Limón Guajes performed by SGS de Mexico S.A. de C.V. (“SGS”) in Durango, and by SGS in Nuevo Balsas, Mexico (each lab is independent of the Company). Gold analyses comprise fire assays with atomic absorption or gravimetric finish.

External check assays for QA/QC purposes are performed by ALS Chemex de Mexico S.A. de C.V. (independent of the Company). The analytical QA/QC program at El Limón Guajes is currently overseen by Carlo Nasi, Chief Mine Geologist for Minera Media Luna, S.A. de C.V.

The scientific and technical data contained in this news release pertaining to mineral resources have been reviewed and approved by Lars Weiershäuser, PhD, PGeo. Dr. Weiershäuser is a “Qualified Person” as defined by NI 43-101, and he is a member of the Association of Professional Geoscientists of Ontario (APGO#1504), has experience relevant to the style of mineralization under consideration, and is an employee of Torex. Dr. Weiershäuser has verified the data disclosed, including sampling, analytical, and test data underlying the drill results, and he consents to the inclusion in this release of said data in the form and context in which they appear.

The scientific and technical data contained in this news release pertaining to mineral reserves has been reviewed and approved by Mr. Clifford Lafleur, P.Eng who is a Qualified Person as defined by NI 43-101 and an employee of the Company. Mr. Lafleur is a registered member of the Professional Engineers of Ontario, has worked the majority of his career in underground hard rock mining in Canada and Mexico in progressively senior engineering roles with relevant experience in mine design and planning, mining economic viability assessments, and mining studies.

Additional information on the ELD deposit, including but not limited to, sampling and analyses, analytical labs, and methods used for data verification is available in the Company’s most recent annual information form and the technical report entitled “Morelos Property, NI 43-101 Technical Report, ELG Mine Complex, Life of Mine Plan and Media Luna Preliminary Economic Assessment, Guerrero State, Mexico ” with an effective date of March 31, 2018 (filing date September 4, 2018) (the “Technical Report”) filed on SEDAR at www.sedar.com and the Company’s website at www.torexgold.com.

Filing of Annual Information Form
Further to its press release on March 30, 2020, the Company is continuing to rely on an exemption provided under Ontario securities law regarding the filing of its AIF for the year ended December 31, 2019, and expects to file its AIF on or around May 6, 2020. The Company confirms that its directors, officers and other employees are subject to the Company’s Insider Trading Policy and such policy reflects the principles in section 9 of National Policy 11-207. The Company also confirms that all material business developments since the March 30th news release have been press released and material change reports filed on SEDAR at www.sedar.com.

About Torex Gold Resources Inc.
Torex is an intermediate gold producer based in Canada, engaged in the exploration, development, and operation of its 100% owned Morelos Gold Property, an area of 29,000 hectares in the highly prospective Guerrero Gold Belt located 180 kilometres southwest of Mexico City. The Company’s principal assets are the El Limón Guajes mining complex (“ELG” or the “ELG Mine Complex”), comprising the El Limón, Guajes, and El Limón Sur open pits, the El Limón Guajes underground mine including zones referred to as Sub-Sill and ELD, and the processing plant and related infrastructure, which commenced commercial production as of April 1, 2016, and the Media Luna deposit, which is an early stage development project, and for which the Company issued an updated preliminary economic assessment in September 2018 (the “Technical Report”). The property remains 75% unexplored.
see for moer on
https://www.torexgold.com/news/torex-gold-reports-2019-year-end-mineral-reserves-and-resources-for-el-limon-guajes-complex



Beperkte weergave !
Leden hebben toegang tot meer informatie! Omdat u nog geen lid bent of niet staat ingelogd, ziet u nu een beperktere pagina. Wordt daarom GRATIS Lid of login met uw wachtwoord


Copyrights © 2000 by XEA.nl all rights reserved
Niets mag zonder toestemming van de redactie worden gekopieerd, linken naar deze pagina is wel toegestaan.


Copyrights © DEBELEGGERSADVISEUR.NL