Solaris Reports 87m of 1.23% CuEq, 93m of 1.01% CuEq and 84m of 1.00% CuEq Improving Modelled Grades Near Surface in MRE

Alleen voor leden beschikbaar, wordt daarom gratis lid!

Algemeen advies 07/10/2024 15:51
October 7, 2024 – Quito, Ecuador – Solaris Resources Inc. (TSX: SLS; NYSE: SLSR) (“Solaris” or the “Company”) is pleased to report assay results from its ongoing 2024 drilling program of 60,000m targeting open extensions of mineralization while upgrading mineral resources and converting waste at its Warintza Project (“Warintza” or “the Project”) in southeastern Ecuador. Highlights are listed below with detailed results in Figure 1 and Tables 1-2.

Highlights

Drill results reported here build on the 2024 Mineral Resource Estimate¹ (“MRE”), with this release including intercepts of high-grade mineralization partially outside of the MRE in the northwest and northeast sectors. Holes in this release also improve upon modelled grades in sparsely drilled areas of the northwest, north and northeast sectors.

Northwest, North and Northeast Sectors:

SLS-102 (drilled northwest): 93m of 1.01% CuEq² within 156m of 0.74% CuEq² from surface
SLS-103 (drilled north): 87m of 1.23% CuEq² within 528m of 0.59% CuEq² from surface
SLS-104 (drilled southeast): 84m of 1.00% CuEq² within 485m of 0.77% CuEq² from surface
SLSE-54 (drilled southwest): 258m of 0.52% CuEq² within 399m of 0.41% CuEq² from surface

Holes SLS-103 and SLSE-54 added new high-grade mineralization at surface partially outside of the MRE in the northwest and northeast sectors, respectively, while all four holes improved upon the modelled grade in their vicinity.

SLS-102 is located in the northwest sector where mineralization has been extended to the contact with a tabular granodiorite that shapes the northwestern pit wall. Step-out exploration drilling testing the potential for mineralization within a large area of undrilled soil anomaly on the far side of this body has been completed with assays expected in the coming weeks.

On Track to Exceed 2024 Drilling Plan:

Warintza continues to see high drilling productivity from significant infrastructure investment at site and is on track to exceed the 60,000m of drilling planned this year, with over 53,000m drilled to the end of Q3/24. Drilling includes holes focused on open extensions and infill of the MRE, as well as condemnation and geotechnical drilling.

Figure 1 – Warintza Drilling and Targets

Warintza Drilling and Targets

Table 1 – Mineral Resource Extension, Infill and Condemnation Results

see & read more on
https://www.solarisresources.com/news/press-releases/solaris-reports-87m-of-123-cueq-93m-of-101-cueq-and-84m-of-100-cueq-improving-modelled-grades-near-surface-in-mre



Beperkte weergave !
Leden hebben toegang tot meer informatie! Omdat u nog geen lid bent of niet staat ingelogd, ziet u nu een beperktere pagina. Wordt daarom GRATIS Lid of login met uw wachtwoord


Copyrights © 2000 by XEA.nl all rights reserved
Niets mag zonder toestemming van de redactie worden gekopieerd, linken naar deze pagina is wel toegestaan.


Copyrights © DEBELEGGERSADVISEUR.NL