Liberty Gold Reports Core Drill Results at the Back Range Zone, Black Pine Oxide Gold Project, Idaho

Alleen voor leden beschikbaar, wordt daarom gratis lid!

Algemeen advies 19/01/2024 08:38
VANCOUVER, B.C. – Liberty Gold Corp. (TSX:LGD; OTCQX:LGDTF) (“Liberty Gold” or the “Company”) is pleased to report assay results from the 2023 core drill program at the Back Range Zone at its Black Pine Oxide Gold Project (“Black Pine”) in southeastern Idaho. Results released herein are from the first three drill holes of the 11 hole, property-wide core program.

BACK RANGE ZONE HIGHLIGHTS:

Drill results from the three core drill holes that were completed in the Back Range Zone have been received with results confirming the strong grades and near-surface mineralization. These core holes were drilled for a Phase 5 metallurgical program projected to begin in 2024 and to gain insights into the complex structural controls in this area.

Drill holes LBP956C and LBP968C were the second and third best holes drilled to date at the Back Range Zone on a grams per tonne x meter (“g/t x m”) basis and intersected strong grades of oxide gold mineralization, with the cyanide soluble assays showing an average of 74% and 87% recovery respectively. These drill results come from a highly deformed, strongly decalcified package of structurally thickened middle plate siltstones. Drill hole LBP969C was drilled for metallurgical testing purposes and hit as-expected results.

Cal Everett, CEO and Director of Liberty Gold commented, “The high grade, oxide gold intercepts from the recent core holes in the Back Range Zone are an important beginning for Liberty Gold this year. The resource grade of Back Range is approximately 20% higher than the average grade of the rest of the Black Pine resource areas discovered to date.

Liberty Gold anticipates approval of the fourth Plan of Operations by mid year that will allow us to drill test the 800 meter long gap between Back Range and the main Discovery area. An updated resource estimate is being completed, which will be the basis for the Pre-feasibility Study due in H2 2024. While these new results will not be included in the new resource estimate, they will be included in future resource updates. Additional core holes in the Discovery area, Tallman and M Zones are pending final analysis.”

BACK RANGE ZONE DRILL TABLE*
see & read more on
https://libertygold.ca/news/news/66-2024-news/482-liberty-gold-reports-core-drill-results-at-the-back-range-zone,-black-pine-oxide-gold-project,-idaho.html



Beperkte weergave !
Leden hebben toegang tot meer informatie! Omdat u nog geen lid bent of niet staat ingelogd, ziet u nu een beperktere pagina. Wordt daarom GRATIS Lid of login met uw wachtwoord


Copyrights © 2000 by XEA.nl all rights reserved
Niets mag zonder toestemming van de redactie worden gekopieerd, linken naar deze pagina is wel toegestaan.


Copyrights © DEBELEGGERSADVISEUR.NL