North Arrow Minerals Inc. (TSXV-NAR) (“North Arrow”) is pleased to report lithium assay results from fall 2023 exploration work at its 100% owned MacKay and LDG Lithium Projects in the Northwest Territories. The two properties are located 10km apart, along the alignment of the annual winter road connecting Yellowknife with the Diavik diamond mine, approximately 13km to the north of LDG. Highlights of these assay results include:
At the MacKay Project, 14 of 17 samples collected from the newly discovered MK3 pegmatite have returned over 1% Li2O, including 5 representative grab samples returning 5.25%, 4.08%, 2.71%, 1.92% and 1.10% Li2O.
A composite rock sawn channel sample from MK3 returned 2.10% Li2O over 4 metres.
Two additional composite 4 metre channel samples from MK3 have returned 1.49% Li2O and 1.43% Li2O.
Three representative grab samples from the previously unsampled northeastern extent of the MK1 spodumene pegmatite returned 3.21% Li2O, 2.62% Li2O and 0.11% Li2O.
Representative samples from the northern extent of the LDG Project’s SD2 spodumene pegmatite have returned 3.19% Li2O, 1.53% Li2O and 1.46% Li2O, extending confirmed spodumene mineralization 260m to the north.
A prospecting sample has returned 5.57% Li2O at the southern end of a newly mapped 200m long subcropping spodumene pegmatite approximately 120m west of the main SD2 pegmatite showing. see & read more on
https://www.northarrowminerals.com/news/press_releases/north-arrow-reports-results-from-mackay--ldg-lithium-projects-nt |