Ximen Concludes 2023 Drilling at Amelia Gold Project

Alleen voor leden beschikbaar, wordt daarom gratis lid!

Algemeen advies 30/11/2023 06:03
VANCOUVER, BC / ACCESSWIRE / November 29, 2023 / Ximen Mining Corp. (TSX.v:XIM)(FRA:1XMA)(OTCQB:XXMMF) (the "Company" or "Ximen") announces that has completed its drill campaign for 2023 and demobilized equipment from the Amelia Gold project in Camp McKinney near Rock Creek in southern BC. The outdoor temporary camp was disassembled and demobilized with the onset of winter conditions.

The Cariboo-Amelia mine was BC's first dividend paying gold mine. Over its 68-year history, the mine produced 81,602 ounces of gold and 32,439 ounces of silver from 112,254 tonnes milled (BC Minfile Records).

The mine is part of a 4-kilometer long system of gold-quartz veins and historic workings. Ximen is planning to continue testing this system, working outwards from the mined area.

see & read more on
https://www.accesswire.com/811201/ximenconcludes2023drillingatameliagoldproject



Beperkte weergave !
Leden hebben toegang tot meer informatie! Omdat u nog geen lid bent of niet staat ingelogd, ziet u nu een beperktere pagina. Wordt daarom GRATIS Lid of login met uw wachtwoord


Copyrights © 2000 by XEA.nl all rights reserved
Niets mag zonder toestemming van de redactie worden gekopieerd, linken naar deze pagina is wel toegestaan.


Copyrights © DEBELEGGERSADVISEUR.NL