I. Introduction
The Oyu Tolgoi LLC (“OT LLC”) Tailing Storage Facility (TSF) Cell 1 seepage collection system, which was
installed in 2013, has not sufficiently contained collected seepage, and a pathway has developed that has allowed
seepage to migrate past the East Toe Collection Dike (the Dike) and enter the Khaliv ephemeral drainage. Water
quality monitoring at the shallow alluvial monitoring bore OTMB16-79 shows an increase since June 2019 in
total dissolved solids (TDS) concentrations. This monitoring bore is located approximately 300m immediately
downgradient of the seepage collection system and inside the Mine License Area (“MLA”).
OT initiated an investigation into the high TDS in November 2021 and has put in place interim mitigation
measures to collect seepage that has bypassed the Dike, and to control further seepage escaping the engineered
containment systems.
Continuous monitoring has been in place and data gathered from monitoring bores indicates that the extent of
seepage is limited beyond the MLA boundary. Current monitoring data show elevated TDS (likely reflecting
seepage) limited to a single shallow alluvial monitoring bore (OTMB22-94) located approximately 60m outside
of the MLA and approximately 370m downgradient of the seepage collection system. Regular updates of the
monitoring and management actions have been provided by OT LLC to the Senior Lenders’ representatives since
May 2022. Review of this data resulted in the request from Lenders for a Detailed Water Review. This Detailed
Water Review was undertaken in September 2023 including representatives from OT LLC, the Lenders, and the
Independent Environmental and Social Consultant (“IESC”).
The Detailed Water Review included a series of site inspections and resulted in the development of a full
understanding of the observed seepage. During the Detailed Water Review, the path forward on the seepage
containment issue was discussed, dividing planned monitoring, mitigation, and remediation efforts into both shortterm and long-term objectives. Recommendations were documented in the September 2023 IESC Compliance
Monitoring Report, issued in December 2023.
Following the Detailed Water Review, the Environmental and Social Agent delivered a notice to OT LLC
indicating that the Policy Lenders were of the view that the TSF seepage issue was considered an Environmental
Incident as described in the Amended and Restated Common Terms Agreement (“Amended and Restated CTA”)
on 12 October 2023. Accordingly, OT LLC officially provided the Notification of Environmental Incident on 18
October 2023 as required under clause 26.12 of the Amended and Restated CTA. OT LLC further prepared a
Remedial Action Plan (RAP) and provided it to the Intercreditor Agent on 11 December 2023 pursuant to clause
26.22 of the Amended and Restated CTA.
As set out in clause 26.22(c) of the Amended and Restated CTA, OT LLC is obliged to provide updates on the
ongoing implementation of any Remedial Action on a 3-month basis. The first, second and third Progress Report
on Remedial Action Plan ("Progress Report”) submitted to the Senior Lenders and at the same time the report was
uploaded into the public website.
This Progress Report (Q1, 2025) covers the actions that OT LLC implemented between 1
st January and 31
st March
2025. This Progress Report describes the progress and achievements made and provides supporting documentation
as evidence.
II. General update
Monitoring result update
Monitoring results (OTMB16-79) shows water level and TDS changes on a daily basis demonstrating the
seasonality. OTMB16-79 logger was frozen after February 8 data upload and it’s still frozen up to now. The latest
TSF monitoring data report is attached to this report.
Figure 1: OTMB16-79 Daily water level an TDS change
Summary of ongoing actions
The remedial action plan consists of a total of 12 actions in three groups or specific areas namely: Tailings Design
and Operations area, Environmental Monitoring and Studies, and Communication and Engagement. Out of total
12 actions, by the end of this reporting quarter, 6 actions are completed, and some initial outcomes are beginning
to be observed. As of Q1 2025, all physical construction works have been completed including the radial trenches.
The remaining actions are to evaluate the effectiveness of improved seepage collection systems and to further
understand the hydrogeological dynamics of mounding effects of groundwater due to pressure from the tailings
within and beyond the seepage collection system.
Major studies and investigation actions including toxicology study, isotopic data analyses (sources, signature),
water treatment options, seepage migration pathways are underway which are a justification base for the OT
LLC’s management to make adequate decision for further actions.
Ecotoxicology study summary:
TSF seepage water quality, its migration and toxicological study is under review and feedback from RT experts,
TSF hydrogeology team are going to be integrated into the report. IESC and Lenders recommendations and
comments also taken into the consideration and reflected into the Final report of the study. Upon the reflecting
the feedback into the final report, OT will submit the Ecotoxicology report to the Lenders before the next Audit
in May 2025.
Below are the initial findings of the study:
• The current Environmental Monitoring Plan does not assess ecotoxicological impacts.
• Indirect exposure routes (e.g., soil ? plants ? animals/humans) should be evaluated by expanding soil
and air monitoring or assessing metal bioavailability. Detecting these substances in seepage requires
specific chemical analysis, though it won't fully capture environmental effects.
• Therefore, standardized ecotoxicity and genotoxicity tests are recommended, starting with existing
sampling points. These tests are proposed but not included in the current study scope. Collaboration with
Mongolian laboratories experienced in environmental biomonitoring is advised.
• The Stage 2 Hydro chemical Assessment of the Oyu Tolgoi TSF evaluated seepage behavior and
contamination pathways using tracer analysis, geochemical modeling (PHREEQC), and historical data.
• Among 96 mixing scenarios, natural processes like evaporite dissolution and cation exchange were found
to complicate the distinction between background and seepage impacts.
• Barge Pond water emerged as the main source of elevated TDS and tracers (notably at OTMB16-79),
while TSF seepage showed limited impact on the alluvial aquifer. Contaminant plumes were localized,
with no evidence of long-range migration.
• Recommendations include enhancing data quality, expanding monitoring, refining models, and adopting
isotopic tracers to better identify sources and support long-term environmental protection.
Defining Isotopic signature using Trace Elements:
75 Isotopic samples were analyzed at the University of Western Australia. Lab results were analyzed with Internal
resource at OT Environment team using the Principal Component Analyses and a linear mixing model based on
geochemical and isotopic parameters to identify primary source contribution to OTMB16-79 bore.
As a result of the Isotopic data analysis:
• It is found out that out of total 44 parameters, following key signatures Cu, K, Na, Cl, Zn, ?34S and
??Sr/??Sr can be used as determine the seepage source and process variations.
• In the framework of the data analysis, the samples were selected for isotopes, trace elements and rare
earth elements to understand seepage risks associated with potential sources and spatial distribution
across the site.
• Isotopic parameters played a critical role in differentiating geological influences (weathered bedrock vs
TSF seepage) and TDS indicators (Na and Cl) highlighted the contribution on TSF seepage water and
evaporative influences.
• Samples from cretaceous sediments, weathered bedrock, and alluvial sources have high ?34S values are
indicating primarily derived from evaporites.
• Higher Sr concentrations paired with lower D-excess values indicate that evaporation plays a dominant
role in modifying water composition within the alluvial aquifer. This is consistent with water sources
experiencing enrichment of Sr due to evaporative concentration.
• The relationship points to a consistent hydrological process within the alluvial bores, where Sr
concentrations trace the movement of water through the system. This can help identify groundwater
recharge zones and flow paths influenced by evaporative or meteoric inputs.
As per recommendations from the IESC and Lenders, Potential Isotopic signature is validated by Piteau as part of
the 12-month dataset review of seepage pathway.
In addition, OT is looking for experienced reviewer within the Rio Tinto network who could validate these results.
Seepage Pathway review with 12month dataset:
Piteau Associates has just completed the 12month dataset review of the seepage. Please note that it is a draft
version and will be fine-tuned with feedback from the IESC and Lenders. OT with support from Piteau will
continue to deepen the understanding of potential seepage pathways.
Major updates on tailings design and construction actions:
Major civil works have been completed, including the cut-off dyke, pond relocation, pumphouse relocation,
French drain trench, and the drilling and installation of additional water monitoring boreholes.
As previously reported, the cut-off dyke was placed 1000 meters to the north, dug to bedrock (8-10 meters deep),
and filled with compacted clay. This will act as a strong barrier to prevent flow paths.
A deeper seepage collection pond has been established near the eastern embankment of TC1 to properly collect
seepage. This pond is located at the lowest point on the eastern side of the embankment, and the OT tailings team
must ensure that the seepage water level remains low, allowing the water to naturally flow back into the pond.
The pumphouse relocation project has been completed, and long-shaft pumps have been installed. These pumps
will be used for continuous operation and will help maintain the seepage pond water at a lower level.
Only additional update of the Q1 2025 was the construction completion of the “Radial” trench earthwork which
help collect back the saturated alluvium west of the cut-off Dyke. Design and plan view is in below.
Additional monitoring boreholes have been drilled and installed in the downstream area of the tailings
embankment to improve monitoring. These boreholes are located at varying distances along the alluvial channel.
Figure 2: Radial drain trench design and plan view
Communications and engagement action:
TSF seepage is recorded as an environmental incident and the corrective action plan incorporates the
suggestions, initiatives, and recommendations of the stakeholders. We are utilizing available channels to ensure
transparency and openness of information.
It is important not only to provide information to TSF downstream herders but also to listen to the suggestions
and recommendations of nearby herders. Therefore, we are visiting the herders' homes, engaging in
conversations, and actively holding advisory meetings. It is more effective to inspect and present the
implementation of corrective actions on-site.
Therefore, each season, we present to stakeholders the results of measurements from the concentrator plant,
Tailings Dams 1 and 2, seepage water collection pumps, the design of the cutoff dam, planned rehabilitation
activities, and monitoring wells inside and outside the fenced area. After each site visit, we organize an open
Q&A session and discussion to reinforce participants' understanding.
Additionally, by presenting the progress of the plan’s implementation at each quarterly meeting of the TPC, it
creates an opportunity for this information to reach other herders and local authorities through the council representatives.
see & read more on
https://admin.ot.mn/wp-content/uploads/Q1-2025-Progress-Report-on-the-RAP-Punblic-EN.pdf
In Mongolië is gisteren (29/4/25) het volgende bericht gepubliceerd. i.v.m. de vertaling door Google is Entree Resources Ltd. Vertaald als Ontre LLC.
De link van naar het originele bericht is: https://isee.mn/n/77320?ref=mongolbeat.com
O. Batnairamdal: Voordat ONTRE LLC, dat tot de Oyu Tolgoi-groep van afzettingen behoort, met mijnbouw begint, moet Mongolië duidelijk maken hoe het van de afzetting zal profiteren
B. Naranchimeg
Politiek2025-04-29
Deel Tweeten
Parlementslid O. Batnairamdal verstrekte informatie over de minerale grondstoffen in de ondergrond van twee gebieden met speciale vergunningen, die behoren tot de Oyu Tolgoi-groep van afzettingen die eigendom zijn van Ontre LLC, de situatie die voortvloeit uit de overeenkomst tussen Rio Tinto en Ontre LLC en gaf op zijn website zijn standpunt weer over hoe Mongolië kan profiteren van de afzetting.
Twee weken geleden heb ik , binnen het kader van mijn mandaat als parlementslid, een vraag gesteld over “Ontre” LLC. Ik wil u intussen graag de betekenis van deze borg en licentie uitleggen.
De Oyu Tolgoi-afzetting is een van de grootste strategische afzettingen van Mongolië. Tot nu toe werd aangenomen dat de gehele afzetting eigendom was van Rio Tinto. Er zijn vijf vergunningen afgegeven voor deze groep afzettingen, waarvan er twee eigendom zijn van Ontre LLC.
Aan weerszijden van het land van Rio Tinto, waarvoor in 2009 een contract werd afgesloten, liggen de gronden van Ontre LLC. Deze afzetting is al 22 jaar in bezit, sinds 2003. Een zeer grote ertsafzetting bevindt zich onder het Rio Tito-terrein en komt terecht op het terrein van Ontre LLC. Aan de andere kant van het gebied dat eigendom is van Rio Tinto, ligt een veld met de naam Heruga, dat ook in licentie is gegeven door Ontre.
Simpel gezegd: de eigenaar van de driehoornige shara, of "Oyutolgolgoy", heeft een overeenkomst gesloten met Mongolië en is momenteel bezig met mijnbouw. De twee families op de markt graven echter ondergronds en nemen het goud en koper mee zonder met de eigenaar van het vermogen te praten. Wij moeten dit corrigeren in overeenstemming met de belangen van Mongolië.
Zelfs het contract tussen deze twee bedrijven wordt al 22 jaar niet gehandhaafd. Ontre LLC bezit 30 procent van het totale erts, 42 procent van het goud, 29 procent van het koper, 29 procent van het zilver en 94 procent van het molybdeen in de Oyu Tolgoi-afzettingen. Het is onduidelijk hoe Mongolië van deze grote rijkdom zal profiteren en hoe het land zijn AMNAT zal berekenen. Dit moet opgelost worden.
Vijf maanden geleden, op 19 december 2024, oordeelde het Arbitragehof in Vancouver, Canada, ten gunste van Ontre LLC. Dit betekent dat Ontre LLC een rechtszaak heeft aangespannen tegen Rio Tinto met de eis dat het bedrijf zijn 22 jaar oude contract moet naleven en dat het bedrijf heeft gewonnen. De twee bedrijven hadden in 2004 al een overeenkomst over de winstdeling getekend, maar ze bleven de formalisering ervan uitstellen. Pas twee maanden geleden werd deze officieel bekrachtigd.
Er werd een arbitragebeslissing genomen om twee licenties van Ontre LLC over te dragen aan Oyu Tolgoi LLC. Deze beslissing werd vijf maanden geleden genomen en drie weken later vroeg ik tijdens de EMB-vergadering: "Wist u dat deze beslissing is genomen? Wat is het standpunt van Mongolië?" Ik heb het gevraagd, maar ik heb nog geen antwoord gekregen.
In december vorig jaar begon ook de ondergrondse mijnbouw in Oyu Tolgoi. Dat wil zeggen dat ze ook zijn begonnen met graven in de gronden van "Ontre". Het is echter onduidelijk welk aandeel Mongolië hiervan zal profiteren.
De belastingvoordelen en -vrijstellingen die zijn opgenomen in de overeenkomst met Rio Tinto uit 2009, zijn niet van toepassing op het land dat eigendom is van Ontre LLC. Daarom is het nu tijd om op deze twee gebieden afzonderlijke contracten te sluiten. De regering zegt dat ze de overeenkomst moet sluiten, duidelijk moet maken hoe Mongolië hiervan zal profiteren en deze vervolgens aan het parlement moet voorleggen.
Met andere woorden: de Mongoolse regering moet een nieuwe investeringsdeal sluiten met het Canadese bedrijf Ontre LLC. We moeten leren van de fouten die in de Oyu Tolgoi-overeenkomst zijn gemaakt en verbeteringen doorvoeren. "Ontre" LLC zal in 2029 beginnen met mijnbouw en winst maken. Daarom is het noodzakelijk om al een beslissing te hebben genomen over de voordelen die Mongolië hiervan zal ontvangen en hoe de AMNAT moet worden berekend. Er is slechts één principe dat in deze overeenkomst gevolgd moet worden. Volgens artikel 6.2 van de Grondwet moet in de overeenkomst duidelijk het principe tot uitdrukking komen dat het grootste deel van de totale opbrengsten uit het gebruik van natuurlijke hulpbronnen toekomt aan het volk, oftewel aan Mongolië.
De investeringsdeal met Oyu Tolgoi is al 16 jaar zeer controversieel. Het is gelukt om 2,3 miljard dollar aan renteschulden te elimineren. Er is echter sprake van een groot informatieverschil tussen drie partijen: Rite Tinto, dat 66 procent van de reserves bezit, de Mongoolse overheid, die 34 procent bezit, en het Mongoolse volk. Er zijn ook veel problemen op het gebied van bestuur.
De meest effectieve oplossing voor dit alles op de lange termijn is om Oyu Tolgoi LLC een beursgenoteerd bedrijf te maken op de Mongoolse effectenbeurs. Het besluit van de Mongoolse kant om haar belang van 34 procent op de effectenbeurs te laten noteren, is een kwestie die van niemand anders afhangt en die ze zelf kunnen oplossen. Hierdoor ontstaat voor Mongolen de kans om een ??aandeel in dit bedrijf te verwerven en hiervan te profiteren.
Aan de andere kant moeten we overstappen op een systeem waarin jonge Mongoolse experts Oyu Tolgoi bestuderen en hun bevindingen openbaar maken. Daarmee wordt de onevenwichtigheid in de informatievoorziening blootgelegd. "Als we dat kunnen doen, kunnen we van Oyu Tolgoi een transparant en open bedrijf maken", zei hij.
Met vriendelijke groet,
met dank aan een Lezer H.L.
commentaar op dit verrassende bericht, waar voor de zittende aandeelhouders Entree Recources en Horizon Copper, wel eens een zonnige toekomsten realiseerbare hogere rendementen in kunnen zitten!.
XEA.nl zit er boven op en ons netwerk wordt alleen maar beter en deskundige! Wij ondsrsteunen elkaar met de mogelijke "puzzelstukjes aan te passen. |