SILVER X ANNOUNCES RESULTS OF A WORK PROGRAM AT THE LILY 19 MINING CONCESSION ADJACENT TO CURRENT OPERATION AT TANGANA

Alleen voor leden beschikbaar, wordt daarom gratis lid!

Overig advies 16/11/2022 15:08
Vancouver, B.C., November 16, 2022 - SILVER X MINING CORP. (TSX-V: AGX) (OTC QB:
AGXPF) (F: WPZ) ("Silver X" or the "Company") is pleased to announce results of a work program
at the 1,000 ha Lily 19 mining concession (“Lily 19”), see Table 1. Lily 19 is 3.5 km from the Company’s existing Tangana mine and contains the northern extension of the San Antonio vein, see Figure 1. The concession covers 1,000 ha (of which 769.6180 ha are effective after discounting the area overlapping
third party properties with priority over the overlapped area), that includes 515 ha of limestones with AgPb-Zn mineralization and 485 ha of intensely altered subvolcanic rocks with vein and disseminated
precious metal mineralization potential.

see pictures and places on
https://uploads-ssl.webflow.com/610d34dd4ceb51224490ac0a/6374cecfe8149a5fa9acad6e_Silver%20X%20-%20Lily19%20-%2015.11.2022%20-%20Clean%20-%20v3.pdf



Beperkte weergave !
Leden hebben toegang tot meer informatie! Omdat u nog geen lid bent of niet staat ingelogd, ziet u nu een beperktere pagina. Wordt daarom GRATIS Lid of login met uw wachtwoord


Copyrights © 2000 by XEA.nl all rights reserved
Niets mag zonder toestemming van de redactie worden gekopieerd, linken naar deze pagina is wel toegestaan.


Copyrights © DEBELEGGERSADVISEUR.NL