Hole V-24-099 returned 1.19 g/t Au over 351.6 m, including 2.05 g/t Au over 166.1 m from surface, strong results infilling a 130 m gap along section
Hole V-24-101 returned 1.05 g/t Au over 356.0 m from surface, including 2.07 g/t Au over 102.0 m, locatedtowards the northeast boundary of current drilling
All other holes currently reported from Valley show continuous gold mineralization over at least 200-meter downhole lengths
Assays remain pending for >11,600 m from 29 holes across three targets at Snowline’s Rogue and Einarson projects.
Vancouver, B.C., December 19, 2024: SNOWLINE GOLD CORP (TSX-V: SGD) (OTC: SNWGF) (the “Company” or “Snowline”) is pleased to announce additional drill results from its 2024 Valley deposit drilling campaign on the Rogue Project in Canada’s Yukon Territory alongside updates on regional exploration. Infill and expansionary drilling continue to delineate consistent mineralization, in this case along the northeast and southeast edges of the Valley deposit along with strong results in V-24-104 and V-24-099 closer to the highest-grade core of the Valley system. The Company still awaits analytical results from >11,600 m of drilling in 29 holes across three different targets.
see & read more on
https://snowlinegold.com/2024/12/19/snowline-gold-intersects-351-6-m-of-1-2-grams-per-tonne-gold-including-166-1-m-of-2-1-grams-per-tonne-gold-from-surface-along-with-multiple-strong-hits-at-its-valley-deposit-yukon/ |