Entrée Resources Announces Second Quarter 2022 Results

Alleen voor leden beschikbaar, wordt daarom gratis lid!

Algemeen advies 08/08/2022 14:44
Vancouver, B.C., August 8, 2022 – Entrée Resources Ltd. (TSX: ETG; OTCQB: ERLFF – the “Company” or “Entrée”) has today filed its interim financial results for the second quarter ended June 30, 2022. All numbers are in U.S. dollars unless otherwise noted.

Q2 2022 HIGHLIGHTS

Oyu Tolgoi Underground Development Update
The Oyu Tolgoi project in Mongolia includes two separate land holdings: the Oyu Tolgoi mining licence, which is held by Entrée’s joint venture partner Oyu Tolgoi LLC (“OTLLC”) and the Entrée/Oyu Tolgoi joint venture property (the “Entrée/Oyu Tolgoi JV Property”), which is a partnership between Entrée and OTLLC. On August 4, 2022, OTLLC’s 66% shareholder Turquoise Hill Resources Ltd. (“Turquoise Hill”) provided an update on Oyu Tolgoi underground development:

COVID-19 cases identified at Oyu Tolgoi continued at low levels in the second quarter 2022 and the testing regime has been eased. OTLLC has continued to progressively increase on-site personnel numbers with the workforce in the second quarter 2022 approaching full capacity. OTLLC’s major focus continues to be the safety and wellbeing of its workers. Ongoing monitoring of COVID-19 cases continues, and controls will continue to be reviewed, as necessary.
During the second quarter 2022, the underground project achieved a significant milestone with the blasting of the first two Panel 0 draw bells on the Oyu Tolgoi mining licence ahead of schedule. The third draw bell subsequently fired on July 29, 2022. The timing of sustainable production from Panel 0 on the Oyu Tolgoi mining licence is trending earlier in the first half 2023.
Underground production activities, including undercut blasting and on-footprint construction work such as roadways and steel set construction, continue to progress well. During the second quarter 2022, a total of 26,098 metres of undercut drilling, 2,071 metres of draw bell drilling and 8,061 square metres of undercut blasting were completed.
Turquoise Hill has completed its review of the 2022 cost and schedule update for the underground project. The 2022 cost and schedule update has resulted in an increase of the total expected underground development capital from $6.75 billion to $7.06 billion. The increase incorporates known and future incremental COVID-19 costs, escalation, associated taxes, and minor impacts of changes in labor laws.
The Shaft 3 headframe was commissioned and sinking commenced on March 31, 2022, with the cumulative sinking level at 183 metres below ground level as at July 3, 2022. Shaft 4 advancement was 288 metres below ground level as at July 3, 2022. The rate of progress in Shafts 3 and 4 improved during the quarter due to the optimization work program to maximize the productivity of their development. The 2022 cost and schedule update identified an approximate 15-month delay in the commissioning of Shafts 3 and 4 from the schedule in the Definitive Estimate. As previously disclosed, Turquoise Hill now expects Shafts 3 and 4 to be commissioned in the first half 2024, and it continues to monitor progress closely against the 2022 schedule update. Shafts 3 and 4 are required to provide ventilation to support production from Panels 1 and 2 during ramp up to 95,000 tonnes per day. The impact of the shaft delays on the commencement of Panels 1 and 2 is currently under assessment by OTLLC. The Hugo North Extension deposit on the Entrée/Oyu Tolgoi JV Property is located in the northern portion of Panel 1.
At the end of June 2022, cumulative underground development on the Oyu Tolgoi mining licence is 70,939 equivalent metres and cumulative Conveyor to Surface advancement is 16,088 equivalent metres.
Design optimization work for Lift 1 on the Oyu Tolgoi mining licence and the Entrée/Oyu Tolgoi JV Property continues with the aim of minimizing risk and maximizing productivity. To support ongoing mining studies, additional data continues to be collected from surface and underground drilling. During the second quarter 2022, drilling was focused on the northern part of Panel 1, the southern part of Panel 2 and Lift 2. For the remainder of 2022, drilling is designed to target Lift 2 and future mining areas which are on the Lift 1 horizon and currently excluded from the mineral reserve. OTLLC has scheduled the Lift 1 Panel 1 design optimization study for completion in early 2023.

Entrée/Oyu Tolgoi JV Property Update

For Panel 1 drilling on the Entrée/Oyu Tolgoi JV Property, the Entrée/Oyu Tolgoi joint venture (the “Entrée/Oyu Tolgoi JV”) has approved a budget with diamond drill holes targeting Hugo North Extension Lifts 1 and 2. Drilling in 2022 is now expected to comprise ~15 underground holes that will all be collared from underground drill stations along the eastern boundary of the porphyry mineralized footprint on the Oyu Tolgoi mining licence but crossing onto the Entrée/Oyu Tolgoi JV Property. As of early August, 11 of the underground holes have been drilled, which includes ~1,575 metres of Lift 1 drilling and ~1,823 metres of Lift 2 drilling out of a total ~5,085 metres expected to be drilled on the Entrée/Oyu Tolgoi JV Property. In addition, two surface diamond drill holes totalling ~3,560 metres are scheduled to be drilled starting in August. These two holes will be entirely on the Entrée/Oyu Tolgoi JV Property and will target the northern portion of the Hugo North Extension deposit. Analytical results of all drillholes are pending. The timing and scope of the Panel 1 drilling is still subject to change.
With the relaxation of COVID-19 related restrictions in Mongolia, exploration drilling programs resumed in 2022. On the Shivee Tolgoi mining licence, three reverse circulation ("RC") holes totalling 900 metres and one 800 metre diamond drill hole have been completed at the North Ulaan Khud target. Analytical results are pending. An additional three planned RC holes totalling 900 metres at North Ulaan Khud, as well as three planned diamond drill holes totalling 2,200 metres at the Airstrip target are underway. On the Javhlant mining licence, five RC holes totalling 1,500 metres are planned for each of the Bumbat Ulaan and West Mag targets, with drilling expected to commence in the third quarter 2022.
The Company continues to monitor the situation in Mongolia including with respect to possible delays to commencement of Panel 1. The Company will assess the potential impact of any delays as it becomes aware of them and will update the market accordingly.
On May 26, 2022, the Company announced it has commenced binding arbitration proceedings to seek declarations and orders for specific performance relating to certain provisions of the Equity Participation and Earn-in Agreement (the “Earn-in Agreement”) with Turquoise Hill dated October 15, 2004, as amended and subsequently assigned to OTLLC and the Joint Venture Agreement appended to the Earn-in Agreement (the “Entrée/Oyu Tolgoi JVA”). The parties have been operating under the terms of the Entrée/Oyu Tolgoi JVA since OTLLC completed its earn-in obligations on the Entrée/Oyu Tolgoi JV Property in 2008. The Company will provide updates on the arbitration as developments warrant.

Corporate

Operating loss was $0.7 million and $1.3 million for the three and six month periods of 2022, respectively, compared to $0.6 million and $1.1 million in the comparative periods of 2021.
Operating cash outflow before changes in non-cash working capital items was $0.7 million and $1.2 million for the three and six month periods of 2022, respectively, compared to $0.6 million and $1.0 million in the comparative periods of 2021.
As at June 30, 2022, the cash balance was $7.7 million and the working capital balance was $7.6 million.
In Q2 2022, the Company welcomed Teresa Conway, Allan Moss and Paula Rogers to its Board of Directors (the “Board”), to join Alan Edwards, Michael Price and Stephen Scott. Mark Bailey, Anna El-Erian and James Harris did not stand for re-election at the Company’s Annual General Meeting held on June 16, 2022 (the “AGM”). Following the AGM, Alan Edwards was appointed Non-Executive Chair of the Board.

OUTLOOK AND STRATEGY
With the commencement of the Lift 1 Panel 0 undercut, Turquoise Hill’s renewed partnership with the Government of Mongolia and execution of a comprehensive funding plan for the world class Oyu Tolgoi underground mine, Entrée’s primary objective for the 2022 year is to confirm the transfer of the Shivee Tolgoi and Javhlant mining licences to OTLLC as manager of the Entrée/Oyu Tolgoi JV, either in conjunction with finalization and execution of amendments to the Entrée/Oyu Tolgoi JVA, or enforcement of certain provisions of the Earn-in Agreement and Entrée/Oyu Tolgoi JVA pursuant to binding arbitration proceedings. The parties have been operating under the terms of the Entrée/Oyu Tolgoi JVA since OTLLC completed its earn-in obligations on the Entrée/Oyu Tolgoi JV Property in 2008. The form of Entrée/Oyu Tolgoi JVA was agreed between the parties in 2004, prior to the execution of the 2009 Oyu Tolgoi Investment Agreement among the Government of Mongolia, OTLLC, Rio Tinto and Turquoise Hill and commencement of underground development. The Company currently is registered in Mongolia as the 100% ultimate holder of the Shivee Tolgoi and Javhlant mining licences.

The Company believes that amendments that align the interests of all stakeholders as they are now understood, would be in the best interests of all stakeholders, provided there is no net erosion of value to Entrée. No agreements have been finalized and there are no assurances agreements may be finalized in the future.

The Company’s interim financial statements and Management’s Discussion and Analysis (“MD&A”) for the second quarter ended June 30, 2022 are available on the Company’s website at www.EntreeResourcesLtd.com, on SEDAR at www.sedar.com and on EDGAR at www.sec.gov.

QUALIFIED PERSON
Robert Cinits, P.Geo., consultant to Entrée and the Company’s former Vice President, Corporate Development, and a Qualified Person as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects, has approved the technical information in this release. For further information on the Entrée/Oyu Tolgoi JV Property, see the Company’s Technical Report (the “2021 Technical Report”), titled “Entrée/Oyu Tolgoi Joint Venture Project, Mongolia, NI 43-101 Technical Report”, with an effective date of October 8, 2021, available on the Company’s website at www.EntreeResourcesLtd.com, on SEDAR at www.sedar.com and on EDGAR at www.sec.gov.

ABOUT ENTRÉE RESOURCES LTD.
Entrée Resources Ltd. is a well-funded Canadian mining company with a unique carried joint venture interest on a significant portion of one of the world’s largest copper-gold projects – the Oyu Tolgoi project in Mongolia. Entrée has a 20% or 30% carried participating interest in the Entrée/Oyu Tolgoi JV, depending on the depth of mineralization. Royalty North Partners, Rio Tinto and Turquoise Hill are major shareholders of Entrée, holding approximately 25%, 9% and 7% of the shares of the Company, respectively. More information about Entrée can be found at www.EntreeResourcesLtd.com.

FURTHER INFORMATION
David Jan
Investor Relations
Entrée Resources Ltd.



Beperkte weergave !
Leden hebben toegang tot meer informatie! Omdat u nog geen lid bent of niet staat ingelogd, ziet u nu een beperktere pagina. Wordt daarom GRATIS Lid of login met uw wachtwoord


Copyrights © 2000 by XEA.nl all rights reserved
Niets mag zonder toestemming van de redactie worden gekopieerd, linken naar deze pagina is wel toegestaan.


Copyrights © DEBELEGGERSADVISEUR.NL